Open joesustaric opened 7 months ago
i was thinking with this that we have a "verification timestamp" which is set to two days before the gig and a "verification check" boolean - we can sort gigs by that date that are due to be verified and use that as a workflow for someone to go through checking gigs that are due to be checked by clicking the link associated with the gig, changing the status to cancelled or confirmed and also check the "verification checked"
We are currently spiking how long manually adding the gigs will take. We also need to verify they are still on. Whats the best way to do it? This could easily take longer than admin