[X] I have searched the existing issues and checked the recent builds/commits
What would your feature do ?
I often find myself wanting to use both "X/Y/Z plot" and "Loopback" at same time, but I can't because they are both in the Script drop-down menu and we can select only one at once.
Please let us use more than one script at once. Thanks.
Proposed workflow
Either an "add script" button instead of a drop-down, so we can add more than one.
Or two script drop-down menus, for "script1" and "script2".
Or put "X/Y/Z plot" outside of the scripts, among other integrated components like ControlNet.
Or put "Loopback" outside of the scripts, among other integrated components like ControlNet.
Is there an existing issue for this?
What would your feature do ?
I often find myself wanting to use both "X/Y/Z plot" and "Loopback" at same time, but I can't because they are both in the Script drop-down menu and we can select only one at once. Please let us use more than one script at once. Thanks.
Proposed workflow
Either an "add script" button instead of a drop-down, so we can add more than one. Or two script drop-down menus, for "script1" and "script2". Or put "X/Y/Z plot" outside of the scripts, among other integrated components like ControlNet. Or put "Loopback" outside of the scripts, among other integrated components like ControlNet.
Additional information
No response