With pooling now out and madmax plotter proving how much faster plots can be done today, who's to say their "5-10 years before raising to K33 minimum" won't become 1 or 3 years?
Request to add arg for K33 and larger sizes for those who are into the ecosystem for long run so that there is no wasteful 3rd replot! I'm running my own plot calculator to exclude K32 as much as possible.
This has been asked before. Please search for issues if its already opened. Adding new K size will require a lot of coding. So it can not be just added as parameter.
With pooling now out and madmax plotter proving how much faster plots can be done today, who's to say their "5-10 years before raising to K33 minimum" won't become 1 or 3 years?
Request to add arg for K33 and larger sizes for those who are into the ecosystem for long run so that there is no wasteful 3rd replot! I'm running my own plot calculator to exclude K32 as much as possible.