Open madscatt opened 8 years ago
We need to think carefully where the folders and filed for the top-level system integration tests are going to be located. This should be done in a consistent way as was done for sasmol.
We need to think carefully where the folders and filed for the top-level system integration tests are going to be located. This should be done in a consistent way as was done for sasmol.