As part of this task, we should implement some logic that will take installation parameters sent from the eNB (from enodebd) and determine parameter delta based on parameters stored in the DB.
If a delta crosses a desired threshold for a parameter, the parameter should be updated in the DB and CBSD should be marked as updated
As part of this task, we should implement some logic that will take installation parameters sent from the eNB (from enodebd) and determine parameter delta based on parameters stored in the DB. If a delta crosses a desired threshold for a parameter, the parameter should be updated in the DB and CBSD should be marked as
updated