Since this wall has no windows, it was fast going initially. On Saturday I stripped the wall bare.
On Sunday I installed the Z-flashing, insect screening, carried 26 sheets of insulation around the house, carried a pile of 8" siding around the house (as furring strips), and had both layers of insulation on 3/4 of the wall.
Then it took 2 more days to complete the last third, mainly because I was working off ladders. All the top pieces of insulation had to be cut, the furring strips all had to be cut, and it just takes much longer to haul all the materials up the ladders, hoist into place, and fasten when working off ladders.
prep walls
install foam insulation