Closed mskg closed 5 years ago
If a plan was configured with only one setpoint, and that plan was evaluated
The result schedule was always in the past, equal to the setpoint. This has been changed to be correctly evaluated to "next week."
Code Climate has analyzed commit b97b028d and detected 0 issues on this pull request.
View more on Code Climate.
If a plan was configured with only one setpoint, and that plan was evaluated
The result schedule was always in the past, equal to the setpoint. This has been changed to be correctly evaluated to "next week."