In a "design view", after a design is decommissioned, a changeset allows to see the design revisions / history and shows valid number of records.
Observed Behavior
In a "design view", after a design is decommissioned, a changeset view indicates a number of objects before a design was decommissioned.
Ie. If there were 15 objects before decommission, after decommission "change records" indicate 15 (instead of 0).
Also, if design is decommission, I would like to know what were the past values.
Steps to Reproduce
Create design
Decommission a design
Navigate to design instance and check design objects panel
Environment
Expected Behavior
In a "design view", after a design is decommissioned, a changeset allows to see the design revisions / history and shows valid number of records.
Observed Behavior
In a "design view", after a design is decommissioned, a changeset view indicates a number of objects before a design was decommissioned. Ie. If there were 15 objects before decommission, after decommission "change records" indicate 15 (instead of 0).
Also, if design is decommission, I would like to know what were the past values.
Steps to Reproduce