Closed caspervdw closed 2 years ago
We should take the max of the two invert levels, instead of the max of the two dmax / or the mean of the two invert levels.
Also check that a manhole's bottom level is <= all its invert levels.
We should take the max of the two invert levels, instead of the max of the two dmax / or the mean of the two invert levels.
Also check that a manhole's bottom level is <= all its invert levels.
126