The downtime will last for one work day. We should give at least 1 month notice. We will schedule once the core switches ship.
Note: It might be possible to do this operation without downtime and only an "at risk" period since the TORS switches are redundant pairs, but this needs to be verified and nodes would need to be configured in LAG mode with both switches to work properly.
The downtime will last for one work day. We should give at least 1 month notice. We will schedule once the core switches ship.
Note: It might be possible to do this operation without downtime and only an "at risk" period since the TORS switches are redundant pairs, but this needs to be verified and nodes would need to be configured in LAG mode with both switches to work properly.