next-exp / nexus

Geant4 simulation framework of the NEXT Collaboration
5 stars 55 forks source link

Use dielectric grids for automatic overlap checks #254

Closed paolafer closed 4 months ago

paolafer commented 4 months ago

The automatic tests that perform the overlap checks were taking ages to be executed, since the implementation of stainless steel grids as the default option in NEXT-100. This PR replaces the macros used for the overlap checks with others that use dielectric grids (the other option).