Closed nhejazi closed 7 years ago
As of 16 August 2017, Bioconductor will be performing a "hard" migration from SVN to Git (that is, SVN support will stop 15 August). This means that it ought to be possible to update packages via Git for the upcoming Bioc 3.6 release. The Bioc Git transition is documented here.
As of 9349978, branch master
of this repository is in sync between both GitHub and the Bioconductor git mirror. Presumably, branch master
on Bioconductor will eventually become the branch RELEASE_3_6
upon the release of version 3.6 this Fall.
This issue can be closed once the current release branch of Bioconductor (aka RELEASE_3_5
is also synced with a branch on GitHub).
After this package was accepted in Bioconductor, the copy made available through their repository was switched over from using
git
tosvn
for version control.As development is taking place on the version hosted on GitHub, it's important to maintain some form of synchronicity between the
git
andsvn
histories. Some resources on this: