Open inhyenoq opened 1 month ago
It will take time for a gradual rollout. Continue with the next sprint.
Edit the purpose. Although we won't set up BIMI in the short term, the DMARC rollout should be gradual.
DMARC under monitoring. Find reports here: https://docs.google.com/spreadsheets/d/1X5fF27xErjEwx3B89S6DZwEjRc-R2obRGvZHjB_V1Rw/edit?usp=sharing Changed to pct=20
Lower the priority. Changed the monitoring frequency to once per week.
@inhyenoq vem kan vara din wingmate på den här?
Det är sub tasks av #625 och Abubaker är wingmate är där.
Changed pct tag to 30 (30%). Monitoring report sent to dmarc@noq.nu (previously google.toolmaster@noq.nu) - it turned out gmail ignore ri tags, so too many reports are arriving daily to the group email.
Story
As Google Workplace admins, we strive to set up DMAR s a preventive measure that helps our emails be sorted correctly in the mail services.
We have set DMARC policy from 24th October 2025, staring with set to p=none and pct=10 as a gradual roll out is recommended. Therefore, we will roll out DMARC and move to the quarantine policy and pct 100.
Required Action
Acceptance Criteria
DMARC records for noq.nu are found with
Definition of Done
All subtasks done or cancelled