Project percentage complete calculates beyond 100% #327

Open jasonpagetas opened 1 month ago

jasonpagetas commented 1 month ago

In the project page there is a field for completed, this shows greater than 100%.

I currently have a Project with 20 tasks, 19 of which are solved. The Projects page shows 1900% complete

jon-nfc commented 1 month ago

In the project page there is a field for completed, this shows greater than 100%.

I currently have a Project with 20 tasks, 19 of which are solved. The Projects page shows 1900% complete

This is insufficient to determine if and where the problem resides. I need the following:

jasonpagetas commented 1 month ago

10 of these are Project Tasks and all of those are complete 4 are requests and 3 are complete The one not complete is assigned 2 are problems and both are complete 1 is an incident and it is complete The remainder are changes and all are complete

jon-nfc commented 1 month ago

In the project page there is a field for completed, this shows greater than 100%. I currently have a Project with 20 tasks, 19 of which are solved. The Projects page shows 1900% complete

This is insufficient to determine if and where the problem resides. I need the following:

  • are all project tasks "tasks" or are any tickets
  • what is the status' of the non-solved task/ticket

I specifically asked for status

jasonpagetas commented 1 month ago

As per the opening description, all items except the request ticket are solved.

The request ticket is assigned

jon-nfc commented 1 month ago

As per the opening description, all items except the request ticket are solved.

The request ticket is assigned

Ack, I'll investigate