Just to note that one of your batches is continually failing and so isn't being commissioned, because the O/D points are basically not very useful - large numbers that are very far from the routable network. You might like to consider how better to do O/D allocation in this area.
The job 'Batch job' did not pass quality control and so has been left
unfinalised and has not been commissioned. Please investigate the failures,
reset the job's status, and re-run it.
You can view the details on the job page at:
/journey/batch/10458/
14,685 routes were expected.
The error rates were as follows:
- Unrouteable due to one way streets.: 1 (0.007%)
- Waypoint #1 is too far from known cycle network.: 13 (0.089%)
- Waypoint #2 is too far from known cycle network.: 170 (1.158%)
Just to note that one of your batches is continually failing and so isn't being commissioned, because the O/D points are basically not very useful - large numbers that are very far from the routable network. You might like to consider how better to do O/D allocation in this area.
Locations:
Zoomed-in example: