Open garro95 opened 5 years ago
Sorry for the delay. I've been preoccupied with my Signet HC campaign (https://www.crowdsupply.com/nth-dimension/signet-high-capacity). I like this idea so I'm assigning the 1.0 tag to it which means I will get to it before version 1.0 is reached.
There should be an option for locking back the client after a given amount of time (that could be chosen in the Preferences) of it being not used.