Open nus-se-script opened 10 months ago
original db - 2019-01-01 original da - 2019-02-02
edit 1 db/2019-03-03 allows user to change the db to a later date than the da
[original: nus-cs2103-AY2324S1/pe-interim#3309] [original labels: type.FunctionalityBug severity.Medium]
Duplicated. Edit command does not check for the DOB < DOA constraint, which was an oversight on our part.
Duplicate of #5843
original db - 2019-01-01 original da - 2019-02-02
edit 1 db/2019-03-03 allows user to change the db to a later date than the da
[original: nus-cs2103-AY2324S1/pe-interim#3309] [original labels: type.FunctionalityBug severity.Medium]