Open nus-se-script opened 1 year ago
The format of the date is dd/mm/yyyy, just the time is wrong but the error message says that the the date is not in a correct format.
[original: nus-cs2103-AY2324S1/pe-interim#5948] [original labels: severity.Low type.FeatureFlaw]
Thanks for your response, however, Key Milestone does not have a "time" field, the error message is clear enough to specify this.
--
The format of the date is dd/mm/yyyy, just the time is wrong but the error message says that the the date is not in a correct format.
[original: nus-cs2103-AY2324S1/pe-interim#5948] [original labels: severity.Low type.FeatureFlaw]