Note from the teaching team: This bug was reported during the Part II (Evaluating Documents) stage of the PE. You may reject this bug if it is not related to the quality of documentation.
Currently, it is unclear what to refer to a possible schedule.
Should this be referred to as an event or a schedule, since the commands in the application refer to such ocurrances as schedules?
Note from the teaching team: This bug was reported during the Part II (Evaluating Documents) stage of the PE. You may reject this bug if it is not related to the quality of documentation.
Currently, it is unclear what to refer to a possible schedule. Should this be referred to as an event or a schedule, since the commands in the application refer to such ocurrances as schedules?
[original: nus-cs2103-AY2324S2/pe-interim#3887] [original labels: type.DocumentationBug severity.VeryLow]