Open nus-se-script opened 1 week ago
In the screenshot below, the budget number is valid as per the instructions, but the system did not allow me to edit my budget of my Buyer as such.
[original: nus-cs2103-AY2425S1/pe-interim#686] [original labels: severity.Medium type.FeatureFlaw]
Duplicate issue that can be fixed by the same solution.
Duplicate of #778
In the screenshot below, the budget number is valid as per the instructions, but the system did not allow me to edit my budget of my Buyer as such.
[original: nus-cs2103-AY2425S1/pe-interim#686] [original labels: severity.Medium type.FeatureFlaw]