Open nus-pe-bot opened 4 years ago
Unsure if tester has misunderstood use of edit command as they mentioned editing the allocated time to allocate one more minute. The edit command would overwrite the existing allocated time rather than add to it.
--
As stated in the image above, I have done the following steps: 1)
start assignment /a 00:02:00
2) I let it run for two minute and then typed in this command,end
to end the assignment. 3) After which, I edited the allocated time to00:01:00
as I would like to allocate one more minute to the task by using this commandedit assignment /ea 00:01:00
. 4) Then, Icontinue assignment
andend
immediately, but the progress bar showed that I have completed 100% of my task.I feel that as a user, sometimes I may want to add in more allocated time to my assignment other than the allocated time that I had initially inputted, so if I had done the following and I see that I have completed 100% of my task, I would feel pretty confused as I am just adding more time that I need into the assignment. I would consider this as a feature flaw as it is lacking in this area. :(
[original: nus-cs2113-AY1920S2/pe-interim#446]