nus-cs2113-AY2324S2 / pe-dev-response

0 stars 0 forks source link

Details in the diagram too small #1965

Open nus-pe-bot opened 3 months ago

nus-pe-bot commented 3 months ago

Note from the teaching team: This bug was reported during the Part II (Evaluating Documents) stage of the PE. You may reject this bug if it is not related to the quality of documentation.


Sequence diagram under Battling Component section is very long and appears to be quite small


[original: nus-cs2113-AY2324S2/pe-interim#2345] [original labels: type.DocumentationBug severity.VeryLow]

tannerlie commented 3 months ago

Team's Response

A lot of methods was not included and reduced as it was deemed to be not as important to be shown. The size of the sequence diagram is deemed to be of an adequate size for a developer to be able to follow

Duplicate status (if any):

--