Open nus-pe-bot opened 1 week ago
While the overall structured-ness of the deadline format is a valid concern, enforcing it however would lead to a loss of our current desired flexibility that we wish to provide to our users. Thus, based on the fact that the flexibility is part of our intended/desired behaviour, the team has decided to reject this bug.
--
While I acknowledge the flexibility in deadline, I feel that when an actual data is put in some error handling needs to be done when receiving an invalid date
Reason for severity: Cause minor inconviniences
[original: nus-cs2113-AY2425S1/pe-interim#643] [original labels: type.FeatureFlaw severity.Low]