Closed ljamt closed 4 years ago
Somehow the SSP refactoring was not caught by the branch updating to cse-core 0.6.0 Aiming for getting master branch back to green with this PR
Closes #53
I didn't notice that the previous PR merge caused problems.
The previous PR build was green. For some reason the cse-core changes was not picked up.
Somehow the SSP refactoring was not caught by the branch updating to cse-core 0.6.0 Aiming for getting master branch back to green with this PR
Closes #53