G3.1.2.6 "Integrated air economizer control shall be included in baseline HVAC Systems 3 through 8, and 11, 12, and 13 based on climate as specified in Table G3.1.2.6"
For additional context, "economizer systems shall be integrated with the mechanical cooling system and be capable of and configured to provide partial cooling even when additional mechanical cooling is required to meet the remainder of the cooling load."
There is currently no way in the schema to specify if the airside economizer is integrated. Proposing a new boolean is_integrated data element in the AirEconomizer group.
G3.1.2.6 "Integrated air economizer control shall be included in baseline HVAC Systems 3 through 8, and 11, 12, and 13 based on climate as specified in Table G3.1.2.6"
For additional context, "economizer systems shall be integrated with the mechanical cooling system and be capable of and configured to provide partial cooling even when additional mechanical cooling is required to meet the remainder of the cooling load."
There is currently no way in the schema to specify if the airside economizer is integrated. Proposing a new boolean
is_integrated
data element in the AirEconomizer group.