Open openBackhaul opened 9 months ago
The currently planned link related switching operation (RedundantTransmittersOff) will switch the transmitters of one link off for saving power, if there is a parallel link that is properly operating.
Also it must be ensured that if a link is turned off, it can be turned on from remote, and not only on site.
Normal case: During the power saving mode, management connection to the remote site of the link will be transported through the remaining parallel link.
In case of failure of the parallel link:
Pranay will clarify with the vendors whether the receiver at the remote site is still operational during the power saving mode, and whether management connection could be re-established by turning on the transmitter at the local site.
Otherwise there would be no chance for turning the power saving link on again from remote.
Also it must be ensured that if a link is turned off, it can be turned on from remote, and not only on site.