Closed renovate[bot] closed 3 months ago
In order to perform the update(s) described in the table above, Renovate ran the go get
command, which resulted in the following additional change(s):
Details: | Package | Change |
---|---|---|
golang.org/x/sys |
v0.20.0 -> v0.21.0 |
|
golang.org/x/term |
v0.20.0 -> v0.21.0 |
Renovate will not automatically rebase this PR, because it does not recognize the last commit author and assumes somebody else may have edited the PR.
You can manually request rebase by checking the rebase/retry box above.
⚠️ Warning: custom changes will be lost.
Hey!
Your images are ready:
ghcr.io/openclarity/vmclarity-apiserver-dev:pr1769-52dc88931cf182c0a94ae887a02c8f182d6a69a8
ghcr.io/openclarity/vmclarity-cli-dev:pr1769-52dc88931cf182c0a94ae887a02c8f182d6a69a8
ghcr.io/openclarity/vmclarity-cr-discovery-server-dev:pr1769-52dc88931cf182c0a94ae887a02c8f182d6a69a8
ghcr.io/openclarity/vmclarity-orchestrator-dev:pr1769-52dc88931cf182c0a94ae887a02c8f182d6a69a8
ghcr.io/openclarity/vmclarity-plugin-kics-dev:pr1769-52dc88931cf182c0a94ae887a02c8f182d6a69a8
ghcr.io/openclarity/vmclarity-ui-dev:pr1769-52dc88931cf182c0a94ae887a02c8f182d6a69a8
ghcr.io/openclarity/vmclarity-ui-backend-dev:pr1769-52dc88931cf182c0a94ae887a02c8f182d6a69a8
This PR contains the following updates:
d81e109
->779b8d1
Configuration
📅 Schedule: Branch creation - "after 8am on Monday" in timezone Etc/UTC, Automerge - At any time (no schedule defined).
🚦 Automerge: Disabled by config. Please merge this manually once you are satisfied.
♻ Rebasing: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.
🔕 Ignore: Close this PR and you won't be reminded about this update again.
This PR has been generated by Mend Renovate. View repository job log here.