The new MaStR dataset added in #1063 contains all data up to 2022-11-17 which is ok if filtered in subsequent power plant tasks (which does not happen except for PV rooftop). This is not suitable for the eGon2021 scenario.
I'll add 2021-12-31 as upper limit for the commissioning date during import.
The new MaStR dataset added in #1063 contains all data up to 2022-11-17 which is ok if filtered in subsequent power plant tasks (which does not happen except for PV rooftop). This is not suitable for the
eGon2021
scenario. I'll add 2021-12-31 as upper limit for the commissioning date during import.@ulfmueller @khelfen