openego / eGon-data

GNU Affero General Public License v3.0
10 stars 4 forks source link

Inconsistency in marginal costs for link components #942

Closed IlkaCu closed 1 year ago

IlkaCu commented 2 years ago

Marginal costs are not set consistently for link components. Some components in foreign components have marginal costs assigned for the eGon100RE scenario, but not inside Germany or in scenario eGon2035. This should be checked and adjusted.

IlkaCu commented 2 years ago

Link components with marginal_costs = 0 in eGon100RE are

carrier VOM needed? comment
power_to_H2 NO components outside Germany got marginal costs assigned
CH4 NO components outside Germany got marginal costs assigned
H2_gridextension NO
H2_ind_load NO This carrier should not be present any more (@AmeliaNadal)
dsm ?
H2_to_CH4 NO components outside Germany got marginal costs assigned
H2_retrofit NO components outside Germany got marginal costs assigned
CH4_to_H2 NO components outside Germany got marginal costs assigned
H2_to_power NO components outside Germany got marginal costs assigned
IlkaCu commented 2 years ago

Link components with marginal_costs = 0 in eGon2035 are

carrier VOM needed? comment
power_to_H2 NO
CH4 NO
rural_heat_store_discharger NO seems plausible to set these costs to 0€
H2_ind_load NO This carrier should not be present any more (@AmeliaNadal)
dsm NO not possible because bi-directional
H2_to_CH4 NO
rural_heat_store_charger NO seems plausible to set these costs to 0€
DC NO not possible because bi-directional
central_gas_boiler YES Data from Danish Energy Agency in technology data available
H2_feedin NO
central_gas_CHP_heat NO electric side of CHP has VOM costs included
central_heat_pump YES Data from Danish Energy Agency in technology data available
rural_heat_pump YES according to Danish Energy Agencey, it is 0€
CH4_to_H2 NO
central_resistive_heater YES Data from Danish Energy Agency in technology data available
central_heat_store_discharger YES according to Danish Energy Agencey, it is 0€
H2_to_power NO
central_heat_store_charger YES according to Danish Energy Agencey, it is 0€
rural_gas_boiler NO will be modeled differently
IlkaCu commented 2 years ago

I converted the lists in the comments above into tables. @ClaraBuettner and @AmeliaNadal: Please add information whether the carriers need to get VOM as marginal costs assigned or not.

ClaraBuettner commented 2 years ago

I will create a branch for the links in heat sector.

ClaraBuettner commented 2 years ago

Besides, no store or storage_unit has any marginal cost. Is that intended?

IlkaCu commented 2 years ago

Besides, no store or storage_unit has any marginal cost. Is that intended?

No, I will create an additional ticket for this issue.

AmeliaNadal commented 1 year ago

I verified in the sources documents that the mentionned (gas) components do not have associated VOM. From my perspective, this issue could be closed (when features/#942-add-vom-heat-sector is merged in dev).