Cost: Standard2x (max of $50/month) to Standard1x (max of $25/month)
Current: 4 Standard2x = 200$
[ ] scale down dynos
[ ] from 4 to 3 Standard2x = 150$
[ ] from 4 to 2 Standard2x = 100$
[ ] from 4 to 3 Standard1x = 75$
[ ] from 4 to 2 Standard1x = 50$
Note: To provide a more accurate real need under stress edit or not, run stress test to the platform. see www.artillery.io. time estimate 2|3|4 weeks (+some additional cost during period to have a 'production clone' environment in review
DB
current standard2 (256 GB, connections 400, ram 8GB) = 200$
[ ] scale down db standard0 (64 GB, connections 120, ram 4GB) = 50$
Note (for future maybe?) if DB storage won't be enough (current size with files 8.4GB (13% standard0) - without files [3.62 GB] it will be 4.78GB (7.47% standard0):
Production
Current spending
$441.00
Dynos
Cost: Standard2x (max of $50/month) to Standard1x (max of $25/month) Current: 4 Standard2x = 200$
DB
current standard2 (256 GB, connections 400, ram 8GB) = 200$
Projected spending
(50\~150)$ + 50$ + 25 + 16 =
(141~241)$
= -(300\~200)$
Review
$59.00