Open sgrellet opened 6 years ago
In geothermy, in a 'Geothermal doublets', we have an injection well and a production well
yes
I'm not very familiar with MAR. Presumably, the main extra piece of information is an injection rate? Conceptually, that's the same as a pump test: a rate, estimated by some method.
There are also construction details that are unlikely to be found in extraction wells, e.g. down hole valves. But I think these are all covered in construction attributes.
Is anything further required to include them ?