Open simonhac opened 1 year ago
Tumut has two units, one of them looks to be retired: https://opennem.org.au/facility/au/NEM/SNOWY2/?range=3d&interval=30m
At the moment, the filter will list facilities with at least one unit's status matching. Maybe another checkbox Only include if all units have the same status
- checked by default?
muja C is 2x 200 MW units and Muja D is 2x 227 MW units.
I believe one of the Muja C units (number 5) was decommissioned in 2022.
https://www.gem.wiki/Muja_power_station
it's often quite messy with decommissioning announcements vs actual decommissioning dates not aligning.
Unclear why some of these have different backgrounds:
Murra Warra has a white background.
Tumut is showing under retired, but it's clearly operational:
• Muja CD showing under retired, but (most of) it is operational — i think we should split out the retired from operational in the table: