Closed tjungblu closed 4 months ago
@tjungblu: This pull request explicitly references no jira issue.
Skipping CI for Draft Pull Request.
If you want CI signal for your change, please convert it to an actual PR.
You can still manually trigger a test run with /test all
/hold cancel
/assign @Elbehery can you PTAL?
/lgtm /approve
[APPROVALNOTIFIER] This PR is APPROVED
This pull-request has been approved by: Elbehery, tjungblu
The full list of commands accepted by this bot can be found here.
The pull request process is described here
/retest-required
Remaining retests: 0 against base HEAD 258a023594ad7cf547b3d41d31072a4dc267b65f and 2 for PR HEAD f56049221fe02d82f5e658c5063aa0323cf2195c in total
/override ci/prow/e2e-aws-ovn-serial
unrelated OLM failure
@tjungblu: Overrode contexts on behalf of tjungblu: ci/prow/e2e-aws-ovn-serial
@tjungblu: The following tests failed, say /retest
to rerun all failed tests or /retest-required
to rerun all mandatory failed tests:
Test name | Commit | Details | Required | Rerun command |
---|---|---|---|---|
ci/prow/e2e-gcp-qe-no-capabilities | f56049221fe02d82f5e658c5063aa0323cf2195c | link | false | /test e2e-gcp-qe-no-capabilities |
ci/prow/e2e-aws-etcd-recovery | f56049221fe02d82f5e658c5063aa0323cf2195c | link | false | /test e2e-aws-etcd-recovery |
ci/prow/e2e-operator-fips | f56049221fe02d82f5e658c5063aa0323cf2195c | link | false | /test e2e-operator-fips |
Full PR test history. Your PR dashboard.
[ART PR BUILD NOTIFIER]
This PR has been included in build cluster-etcd-operator-container-v4.17.0-202406210743.p0.g0a00f2a.assembly.stream.el9 for distgit cluster-etcd-operator. All builds following this will include this PR.
on CEO restart the informer is sometimes not synchronized, which causes premature leaf cert generation as the bootstrap thinks it's not done yet.