Closed tjungblu closed 2 months ago
please take a quick look whether those changes are sensible w.r.t to what's done in library go
/assign @vrutkovs
/retest-required
Remaining retests: 0 against base HEAD fde15811e0a41ec0754397282937942b3f893645 and 2 for PR HEAD 89c955dd9cbfd7ad458a70b9710727454a05c592 in total
/lgtm
/retest-required
Remaining retests: 0 against base HEAD fde15811e0a41ec0754397282937942b3f893645 and 2 for PR HEAD 520de2646d5cbf60552f39ab24029cde512f5b36 in total
/hold
needs further fixing in library-go
/hold cancel
/lgtm
[APPROVALNOTIFIER] This PR is APPROVED
This pull-request has been approved by: dusk125, tjungblu, vrutkovs
The full list of commands accepted by this bot can be found here.
The pull request process is described here
/retest-required
@tjungblu: The following tests failed, say /retest
to rerun all failed tests or /retest-required
to rerun all mandatory failed tests:
Test name | Commit | Details | Required | Rerun command |
---|---|---|---|---|
ci/prow/e2e-aws-etcd-certrotation | b86a93c205475aefcb23f6cee1387b83a2b20de5 | link | false | /test e2e-aws-etcd-certrotation |
ci/prow/e2e-metal-ovn-sno-cert-rotation-shutdown | b86a93c205475aefcb23f6cee1387b83a2b20de5 | link | false | /test e2e-metal-ovn-sno-cert-rotation-shutdown |
ci/prow/e2e-aws-etcd-recovery | b86a93c205475aefcb23f6cee1387b83a2b20de5 | link | false | /test e2e-aws-etcd-recovery |
ci/prow/e2e-metal-ovn-ha-cert-rotation-shutdown | b86a93c205475aefcb23f6cee1387b83a2b20de5 | link | false | /test e2e-metal-ovn-ha-cert-rotation-shutdown |
Full PR test history. Your PR dashboard.
[ART PR BUILD NOTIFIER]
Distgit: cluster-etcd-operator This PR has been included in build cluster-etcd-operator-container-v4.18.0-202409021542.p0.gd2a0273.assembly.stream.el9. All builds following this will include this PR.
@tjungblu: This pull request explicitly references no jira issue.