ourStoryNetwork / lp81-operations-platform

Discussions around the processes and coordination of the ourStory bMO Community
GNU General Public License v3.0
0 stars 0 forks source link

5.4.3 Proof-of-Work #33

Open trainfarb opened 1 year ago

trainfarb commented 1 year ago

5.4.3 v0.00.00 - Brainstorm Metadata Structure

2023 09 06

Minimum Problem

When trying to put your energy into a creative project, the last thing you want to worry about is money and bookkeeping. A lot of people get taken advantage of because money is really complicated.

Viable Solution

Create a simple proof-of-work protocol that breaks down each milestone in a project deliverable into smaller chunks so both streamers and subscribers can have a deeper understanding of how value is being exchanged.

Product Hypothesis

If people understand how to design engineer their own proof-of-work protocols, then they will have a higher probability of achieving their desired standard of living.

Each verse is broken down into 4 stages within the database 0.9.0 Onboarding Metadata 0.9.0_oS3 (Background Research/ Metadata POW) 0.9.1_ourStory (Metadata Curriculum > Create Template POW) 0.9.2_openSource (Tokenization) 0.9.3_operatingSystem (Demonstrate PoW)

Verse Number and Version is how it's grouped

Price is set, this isn't a way of justifying the price. This is a way for the streamer to see if they can increase their profit margins by decreasing the time spent.

Here are the Columns:

This is a transparent look at a company. All of this is an issue that has links to each Comment associated with the deliverable

Next Step: 5.4.3 v0.00.01 - Research Lesson Topic

trainfarb commented 1 year ago

hold space