CAD is mostly finished, with only a couple remaining items.
CAD Todo:
Add crushblocks for swerve mounting to prevent overtightening bolts/bending of tube (will be done by tn)
Add swerve module covers to the front two modules to help prevent notes getting into wheels and guide them into the intake
CAD final bellypan to be cut out of 1/8" or 0.09" thick steel after electrical finalizes mounting on pocketed bellypan (will be done later in the season once electrical finalizes mounting)
CAM Todo:
All drivebase parts have their CAM completed and gcode is on the CNC's USB.
CAD: https://cad.onshape.com/documents/0c0960b306f448c5b1808000/w/ce428a1556e71539e8a0c442/e/c2db2c05d8e732b818655dd6