Closed ArvickC closed 7 months ago
Group A got the elevator mostly completed. Group B has most tubing CNC'd for the elevator
Group A fixed chain issue on elevator, with plans to either mount on the drivebase or give to electrical to wire. Group B cut out all tubing for the second elevator and began assembly, attaching most (if not all) bearing blocks to their respective places on the tubing.
Handed off to programmers 2/2
Two groups: Group A: Led by @Ants1the1 Group B: Led by @esjyoon
A: Got tubing cut out, started assembling based on cad in #204 B: Working on cutting out tubing, dimensions found in #204