Closed ArvickC closed 8 months ago
Before we go ahead and cut everything out of aluminum, we are testing a couple of core systems for the launcher using MDF. Reference #259 for the second iteration. We already know our launcher setup works from our prototypes, but still need to test our handoff as well as our wrist system. To do this we’ll assemble everything on the launcher except the flywheel system. Not putting on the flywheels saves us a fair bit of manufacturing and assembly time and allows us to get the system to programming for testing much earlier. assembly will start today (2/5)
Cad can be found here. Refer @SanchitArora44 or @esjyoon if you have questions.