Closed ArvickC closed 6 months ago
New tubing was cut out and made square 2/5, will need to be run through the CNC today (2/5)
Second iteration elevator finished and mounted as of 2/13, still need to switch out for hooks and final wrist/launcher system (ideally by 2/14)
Mounting hooks onto elevator 2/29 Mounting new plates on elevator 2/29
Had problems with the tubing, new chop saw arrived 2/3, and plan on cutting tubing W5. reference the cad here