Closed mkestra closed 1 year ago
@ghalym this has now been pre-commit checked and should be ready for review. Please note a lot of, strictly formatting file changes from pre-commit.
@ghalym I have just committed with a fresh run of pre-commit check and it now passes all checks. Kindly review and approve if appropriate? I need to start working on changes for the roughing pump configuration.
This PR is to save changes that were made for the X-motion of Aperture 4 on AT1K0. the only changes here are to set the soft limits of the system for the newly calibrated LVDT and change the expected nominal point of the X-motion for PMPS. Latest commit was to run pre-commit and some significant formatting changes resulted in multiple files.
Description
Motivation and Context
The old LVDT on Aperture 4 was sticking so we replaced it with a new one and recalibrated.
How Has This Been Tested?
Verified with alignment that these parameters are sufficient when attempting to reach hard limits, soft limits, null point, and beam-center.
Where Has This Been Documented?
On a Jira ticket, https://jira.slac.stanford.edu/browse/LCLSECSD-1897
Screenshots (if appropriate):
Pre-merge checklist
Always Newest
pre-commit
(alternativelypre-commit run --all-files
)