feat(PMF-140): reverted changes from Mike E PR #6 that correlated the PTM-140 0unit with the PMF-120 unit. The PTM-140 unit is now interlocked with its associated roughing pump PMF-140 #8
The roughing pump PMF-140 was reinstalled and reinterfced to turbo pump PTM-140. We must update the application logic such that PTM-140 is interlocked to PMF-140. This PR serves to revert PR #6 .
How Has This Been Tested?
Tested with Dan live. It works!
Where Has This Been Documented?
Screenshots (if appropriate):
We also updated the relevant UI screen hosted at location: reg/g/pcds/epics-dev/mghaly/screens/vacuumscreens/AT1K0-GAS.ui
^ tested with Dan. Beamline pressures still high but that is because the rest of the beam isn't vented.
Description
Reverted interlock change such that PTM-140 is interlocked via roughing pump PMF-140. The same was done for VVC-140.
https://github.com/pcdshub/lcls-plc-kfe-gatt/blob/05e5f9eddf00ce2afffb6fafd3af6d1ae5d45acb/plc-kfe-gatt/plc_kfe_gatt/POUs/PRG_GATT.TcPOU#L107
https://github.com/pcdshub/lcls-plc-kfe-gatt/blob/05e5f9eddf00ce2afffb6fafd3af6d1ae5d45acb/plc-kfe-gatt/plc_kfe_gatt/POUs/PRG_GATT.TcPOU#L137
https://github.com/pcdshub/lcls-plc-kfe-gatt/blob/05e5f9eddf00ce2afffb6fafd3af6d1ae5d45acb/plc-kfe-gatt/plc_kfe_gatt/POUs/PRG_GATT.TcPOU#L140
Motivation and Context
The roughing pump PMF-140 was reinstalled and reinterfced to turbo pump PTM-140. We must update the application logic such that PTM-140 is interlocked to PMF-140. This PR serves to revert PR #6 .
How Has This Been Tested?
Tested with Dan live. It works!
Where Has This Been Documented?
Screenshots (if appropriate):
We also updated the relevant UI screen hosted at location:
reg/g/pcds/epics-dev/mghaly/screens/vacuumscreens/AT1K0-GAS.ui
^ tested with Dan. Beamline pressures still high but that is because the rest of the beam isn't vented.