issues
search
pcdshub
/
lcls-plc-las-bts
Laser Hall Beam Transport vacuum and shutter control
https://pcdshub.github.io/lcls-plc-las-bts/
Other
0
stars
4
forks
source link
WIP: Update I/O and outdated code
#1
Closed
sfsyunus
closed
3 years ago
sfsyunus
commented
3 years ago
Changes:
Deleted and re-added all I/O since these were not up to date
Added all pragmatized links to GVL_BTS_VAC
Updated to latest LCLS libraries
VVC2 and VVC3 were set up as normally closed valves, corrected these
Added some empty PMPS logic to stop build from crying
Intention:
For Day1 need the gate valves operable, gauges reading out, and ion pumps operable in EPICS, turbo and roughing pump control can come later
Changes:
Intention: