When specifying two storage variants for a single hybrid generation project, the model is never selecting these resources, which suggests that there might be some conflicting constraints. The model seems to work if the variants are specified on the generator side, with two different storage projects that are linked to each of the generator variants.
TODO:
[ ] Set up test run with storage variants, and export model instance
[ ] Explore model instance to see if constraints are working properly
When specifying two storage variants for a single hybrid generation project, the model is never selecting these resources, which suggests that there might be some conflicting constraints. The model seems to work if the variants are specified on the generator side, with two different storage projects that are linked to each of the generator variants.