I added some extra slippage tolerance for the USDC/USDC.e -> axlUSDC exchange (here 10 basis points), because I had some failures during testing when there was a tiny loss as the expected amount did not arrive on Pendulum and the flow could not continue.
Closes #80
I added some extra slippage tolerance for the USDC/USDC.e -> axlUSDC exchange (here 10 basis points), because I had some failures during testing when there was a tiny loss as the expected amount did not arrive on Pendulum and the flow could not continue.