Closed AceLeader2023 closed 8 months ago
Thanks, are you using the Android version too now? Was the install process ok?
Which version was this installed from? In 2.3.0 in Chrome seems to be ok and 2.2.0 is ok on Android. You can tell the version from the logo, the version number came in with 2.2.0 so if there is no version is it likely 2.1.0 or older.
Chrome = 2.3.0 Android = 2.2.0 Both do not have the correct style, as I see above in your pics.
Yes using the Android version now, too - the installation process was easy
Here is a screenshot of the Android output.
Note covered Activity ID
I have just created a new plan, and it has the correct styling when the plan has not been concluded on both Android and Chrome.
So the incorrect button style is when the plan has been concluded.
Oh OK, I hadn't looked at a concluded plan, I can confirm the issue now. Thanks for the info.
Fixed in V2.4.0, release pending.
Hi Peter,
Doing a great job.
I've just noticed on both the Chrome version and the Android app that the style of the "save to calendar" button in programming is not consistent with the other buttons for Summit.
Thanks again for all your hard work.
Adam 2nd Eltham Sea Scouts