pik-piam / remind

Contains the REMIND-specific routines for data and model output manipulation.
3 stars 18 forks source link

problem with reporting of Technology costs #73

Open robertpietzcker opened 4 years ago

robertpietzcker commented 4 years ago

the reporting of

"Tech|Electricity|Storage|Battery|For Wind" "Tech|Electricity|Storage|Battery|For PV" "Tech|Electricity|Storage|Battery|For CSP Tech|Transport|Pass|Road|LDV|ICE|Capital Costs Tech|Transport|Pass|Road|LDV|EV|Capital Costs Tech|Transport|Pass|Road|LDV|H2|Capital Costs Tech|Transport|Pass|Road|LDV|ICEH2|Op Costs Tech|Transport|Pass|Road|LDV|EV|Op Costs Tech|Transport|Pass|Road|LDV|H2|Op Costs

in reportTech needs to be changed.

Currently they report the REMIND-internal values for mix technologies (for storspv/storwind) or a fraction of a vehicle (for LDV), so they should not be reported like "real values", and never uploaded in project reports.

Solution:

  1. change the existing names to: "Tech|Electricity|Storage|StorWind" "Tech|Electricity|Storage|StorSPV" "Tech|Electricity|Storage|StorCSP" Tech|Transport|Pass|Road|LDV|0.65 of an ICE|Capital Costs Tech|Transport|Pass|Road|LDV|0.65 of an ICEEV|Capital Costs Tech|Transport|Pass|Road|LDV|0.65 of an ICEH2|Capital Costs Tech|Transport|Pass|Road|LDV|0.65 of an ICEH2|Op Costs Tech|Transport|Pass|Road|LDV|0.65 of an ICEEV|Op Costs Tech|Transport|Pass|Road|LDV|0.65 of an ICEH2|Op Costs

  2. upscale the LDV costs by dividing by 0.65

  3. Calculate actual battery costs from the

  4. Implement seperate battery technology, H2 electrolysis technology and H2 turbine technology that are required in different parts from storspv, storwind and storcsp