Currently they report the REMIND-internal values for mix technologies (for storspv/storwind) or a fraction of a vehicle (for LDV), so they should not be reported like "real values", and never uploaded in project reports.
Solution:
change the existing names to:
"Tech|Electricity|Storage|StorWind"
"Tech|Electricity|Storage|StorSPV"
"Tech|Electricity|Storage|StorCSP"
Tech|Transport|Pass|Road|LDV|0.65 of an ICE|Capital Costs
Tech|Transport|Pass|Road|LDV|0.65 of an ICEEV|Capital Costs
Tech|Transport|Pass|Road|LDV|0.65 of an ICEH2|Capital Costs
Tech|Transport|Pass|Road|LDV|0.65 of an ICEH2|Op Costs
Tech|Transport|Pass|Road|LDV|0.65 of an ICEEV|Op Costs
Tech|Transport|Pass|Road|LDV|0.65 of an ICEH2|Op Costs
upscale the LDV costs by dividing by 0.65
Calculate actual battery costs from the
Implement seperate battery technology, H2 electrolysis technology and H2 turbine technology that are required in different parts from storspv, storwind and storcsp
the reporting of
"Tech|Electricity|Storage|Battery|For Wind" "Tech|Electricity|Storage|Battery|For PV" "Tech|Electricity|Storage|Battery|For CSP Tech|Transport|Pass|Road|LDV|ICE|Capital Costs Tech|Transport|Pass|Road|LDV|EV|Capital Costs Tech|Transport|Pass|Road|LDV|H2|Capital Costs Tech|Transport|Pass|Road|LDV|ICEH2|Op Costs Tech|Transport|Pass|Road|LDV|EV|Op Costs Tech|Transport|Pass|Road|LDV|H2|Op Costs
in reportTech needs to be changed.
Currently they report the REMIND-internal values for mix technologies (for storspv/storwind) or a fraction of a vehicle (for LDV), so they should not be reported like "real values", and never uploaded in project reports.
Solution:
change the existing names to: "Tech|Electricity|Storage|StorWind" "Tech|Electricity|Storage|StorSPV" "Tech|Electricity|Storage|StorCSP" Tech|Transport|Pass|Road|LDV|0.65 of an ICE|Capital Costs Tech|Transport|Pass|Road|LDV|0.65 of an ICEEV|Capital Costs Tech|Transport|Pass|Road|LDV|0.65 of an ICEH2|Capital Costs Tech|Transport|Pass|Road|LDV|0.65 of an ICEH2|Op Costs Tech|Transport|Pass|Road|LDV|0.65 of an ICEEV|Op Costs Tech|Transport|Pass|Road|LDV|0.65 of an ICEH2|Op Costs
upscale the LDV costs by dividing by 0.65
Calculate actual battery costs from the
Implement seperate battery technology, H2 electrolysis technology and H2 turbine technology that are required in different parts from storspv, storwind and storcsp