Conduct preliminary design review first week of June
Goal: Demonstrate that the preliminary design has a reasonable expectation of satisfying the requirements within the currently allocated budget, schedule, and risks
Artifacts to be assesed:
Mission Concept
System Requirements
Risks
Standards being followed
Interface Control Documents (ICDs)
Verification and Validation (V&V) Plan to include requirements to test traceability