Description :
[TC-IDM-4.3] - The YAML script needs to be updated as per the Verification Document for step 3 from On TH(chip-tool), Verify that there is an empty report data message sent from the DUT to the TH to this On the TH (chip-tool), verify that the DUT sends an empty report data message after the MinInterval time and no later than the MaxInterval time plus the retransmission time as per the MRP parameters.
Description : [TC-IDM-4.3] - The YAML script needs to be updated as per the Verification Document for step 3 from On TH(chip-tool), Verify that there is an empty report data message sent from the DUT to the TH to this On the TH (chip-tool), verify that the DUT sends an empty report data message after the MinInterval time and no later than the MaxInterval time plus the retransmission time as per the MRP parameters.
.
The Verification Document has been updated due to the test plan changes in the expected outcome: : https://github.com/CHIP-Specifications/chip-test-plans/pull/4138
PFA VS Doc Screenshot :
YAML script Screenshot :