Open ksnmoore opened 1 month ago
The way I would be inclined to implement this would be to have the electrolysis setup be the thing that has the subscene, and just have it require the mold in place before doing anything with it. @ksnmoore, would that be correct/realistic?
Right now you much load the gel before putting it in the rig, which is not how a gel should be loaded. It should be loaded after it's in the rig.