Some recent discussions on the OpenSWMM mailing list shows that there is some interest in linking SWMM to a 2D surface domain. This as been done by some commercial packages, and by researchers as well [1, 2]. I achieved this in Itzï by using Cython, but it could be much cleaner (and possibly faster) if this computation is done directly in the SWMM model.

I believe this would be a nice addition to SWMM. I have an adea on how it could be implemented. I'll detail it is subsequent posts.

See related issues:

110

[1] Seyoum, Solomon Dagnachew, Zoran Vojinovic, Roland K Price, and Sutat Weesakul. 2012. “Coupled 1D and Noninertia 2D Flood Inundation Model for Simulation of Urban Flooding.” Journal of Hydraulic Engineering 138 (1). American Society of Civil Engineers:23–34. [2] Leandro, J., and R. Martins. 2016. “A Methodology for Linking 2D Overland Flow Models with the Sewer Network Model SWMM 5.1 Based on Dynamic Link Libraries.” Water Science and Technology 73 (12):3017–26. https://doi.org/10.2166/wst.2016.171.

lrntct commented 6 years ago

I think that it could be implemented in the following way, by using orifice and weir equations to calculate the flow:

A function that loop through the nodes, calling another function for each node:

To calculate the flow, the main function needs to be aware of two values from the surface model:

This could be done in two way:

I think that the first option my be the best, as the AoS could contain the calculated flow, as a feedback to the surface model.

The TNode struct should have new values added:

A more advanced way could be to link to another "manhole cover" object, that would determine those coefficients and the manhole shape. Those values influence the actual flow

My knowledge of the SWMM code base is not very deep, so I'd be glad to have the opinion of other developers on that.

It might be adequate to use ExtInflow for the calculated flow, as it could transfer pollutants. However, could ExtInflow be negative in case of outflow?

lrntct commented 6 years ago

Some theory on the use of weir and orifice for the flow calculation are found here: http://documents.irevues.inist.fr/bitstream/handle/2042/25250/0465_239chen.pdf

I would propose to simplify the solution described in this paper by using only the orifice equation when the node is overflowing.

This solution as been proven with comparison to a physical model:

Rubinato, Matteo, Ricardo Martins, Georges Kesserwani, Jorge Leandro, Slobodan Djordjević, and James Shucksmith. 2017. “Experimental Calibration and Validation of Sewer/surface Flow Exchange Equations in Steady and Unsteady Flow Conditions.” Journal of Hydrology 552 (September):421–32. https://doi.org/10.1016/j.jhydrol.2017.06.024.

RudyFrom3 commented 6 years ago

I would expect that there would be a benefit to having BOTH the Weir and orifice equation applying, as described in many texts such as the 1956 John Hopkins University "The Design of Storm Water Inlets", whereby the opening operates as a weir, until it is drowned and then acts as an orifice. For this to occur an effective weir length L is required and an effective clear opening area A (accounting for bars etc.)

Noting that at times there may be two sets of these required for say a Grated Opening plus a Kerb Inlet.

The Alternative approach is a RATING Curve.

Note also that application of a Blockage factor or functional would also be very useful.

lrntct commented 6 years ago

I would expect that there would be a benefit to having BOTH the Weir and orifice equation applying, as described in many texts such as the 1956 John Hopkins University "The Design of Storm Water Inlets", whereby the opening operates as a weir, until it is drowned and then acts as an orifice. For this to occur an effective weir length L is required and an effective clear opening area A (accounting for bars etc.)

What I propose:

However, different authors use different combinations, and it does not seems that there is a definite answer to that.

For the weir length and opening area, I was thinking that we could start with a simplified model that:

However, in reality the lid is usually smaller than the actual manhole, and a more complex system might be useful. It is what I was referring to when proposing the addition of a "manhole cover" object. This object could contain the following information:

Noting that at times there may be two sets of these required for say a Grated Opening plus a Kerb Inlet.

Of course, the reality is more complex, and there are way to represent it more finely. For example, see this article about drainage and overflow from various inlets, and taking into account the lifting force of the manhole cover:

Chen, A. S., Leandro, J., & Djordjević, S. (2015). Modelling sewer discharge via displacement of manhole covers during flood events using 1D/2D SIPSON/P-DWave dual drainage simulations. Urban Water Journal, 9006(August), 1–11. https://doi.org/10.1080/1573062X.2015.1041991

However, implementing a solution like this might be much more complex, and we have to evaluate the its actual benefit. For a software like SWMM that is usually used on a large scale (city-wide), I'm not sure if it is worth the pain. In the real world, having complete information of the main drainage network is already quite rare. I don't know if many utilities have informations about the inlets locations and numbers, yet alone their types. There might be some use cases where those modelling details are useful, but for now it looks like a first world problem to me.

Note also that application of a Blockage factor or functional would also be very useful.

That would be indeed interesting. Do you have any literature recommendation on that matter?

RudyFrom3 commented 6 years ago

In Australia there are a few papers on Culvert Blockage (more so than pits) however many local authorities require a blockage factor to be applied when undertaking analysis. I will try and track down resources. For example Wollongong City Council specifies 50% and 80% blockage in:

http://www.wollongong.nsw.gov.au/council/governance/Policies/Wollongong%20DCP%202009%20Chapter%20E14%20-%20Stormwater%20Management.pdf
Similarly: http://www.nillumbik.vic.gov.au/files/assets/public/council/council-publications/drainage_design_guidelines_january_2013.pdf

However the notion of using a Factor on the calculated flow (Q) for the pit inlet capacity is useful, for both analysing the impact of blockage, but also testing the system with say a Factor of 2 to double the capacity (to easily assess impact of doubling the pit capacity).

lrntct commented 6 years ago

@RudyFrom3 It seems to me that those documents are more like general design guidelines that call for a "safety factor", more than the actual occurring clogging, and even less how the blockage build-up in time during an event. We could potentially add a inlet efficiency coefficient, but it might be redundant with the weir and orifice coefficients. Furthermore, clogging is not the only source of inlet inefficiency [1]. Accurately estimating the actual flow passing through an inlet is a complex subject and it does not seems settled yet among the scientific and engineering community

[1] Inefficiency of storm water inlets as a source of urban floods J. Despotovic, J. Plavsic, N. Stefanovic, D. Pavlovic Water Science and Technology Jan 2005, 51 (2) 139-145;

lrntct commented 6 years ago

As for representing multiple inlets, creating multiple smaller junctions (see #112) might be the easiest way to do it, instead of setting complex multiple-linking elements.

RudyFrom3 commented 6 years ago

I would have thought that the NODE simply be given some surface OPENING characteristics that define how FLOW from the surface enters the NODE. The NODE is simply a small storage that is part of the the internal transfer between links, and allows for additional surface flow to enter through the OPENING that is on the surface. Typically the opening would act as a weir initially and then at some higher depth act as an orifice. (Or it could be described by a rating curve Depth Versus Flow)

lrntct commented 6 years ago

@RudyFrom3 I agree with you. That is why I was proposing a a "manhole cover" object. See my post above.

However, in reality the lid is usually smaller than the actual manhole, and a more complex system might be useful. It is what I was referring to when proposing the addition of a "manhole cover" object. This object could contain the following information:

cover surface area
circumference of the opening
orifice and weir coefficients
...

But this does not negate the need of a way to set the manhole (not opening) area individually.

RudyFrom3 commented 6 years ago

The only reason I think it would be useful for the Manhole Lid Object to have Multiple Child Objects that represent openings is as in the following example: image Where the Grate has a Weir Length initially (Pink Lines) then an Effective Area (The openings in the grate) and the Kerb Inlet has initially a weir length (green line) followed by a vertical orifice opening being the yellow outline.... So the calculation for discharge would involve: Qgrate(low) = CLD^1.5 Qkerb(low) =CLD^1.5 Qgrate(high) = Q = Cd A\sqrt{2gD} Qkerb(high) = Q = Cd A\sqrt{2gD} (Or better for large lateral apertures?)

Etc....

lrntct commented 6 years ago

@RudyFrom3 Maybe one Node object could have multiple nodeOpenning objects to take into account those cases? But then again, this type of approach implies substantial changes in the swmm code.

As a first step, we could consider that the nodes are circular and have one opening of the size of the node surfaceArea. It is far from perfect and it is a strong simplification, but the implementation would be much easier. I think I could implement this rather quickly, as I already did something very similar in another software. This would allow us to test it and work on the interface with our respective 2d models. Then, later, we could work on adding the nodeOpenning objects.

But, the nodeOpenning object struct would have the advantage of structuring better the data. Without it, we will have orifice/weir coefficients inside the Node struct, which is not ideal.

lrntct commented 6 years ago

Another thing to think about is what happen to the overflow and ponding calculations that are already present in swmm.

lrntct commented 6 years ago

I'm working on an implementation. It might take some time before it is functional.

dickinsonre commented 6 years ago

You should also worry about what happens when a manhole surcharges as it shifts to a new node solution when the depth in the node is above the ycrown of the highest connecting link to the node. It might be cleaner to just have storage nodes connect to a 2D mesh.

lrntct commented 6 years ago

@dickinsonre Thank you for your comment. I think you refer to what is done in setNodeDepth()? Why is a surcharged node treated differently? If it is for stability, what would make a storage more stable?

dickinsonre commented 6 years ago

A quick answer and a better answer is to took at the EPA Hydraulics manual for SWMM5, Lew Rossman does a great job of presenting HOW the Surcharge solution is different than the normal node continuity equation. Here is a link as well as on OPENSWMM.ORG https://www.openswmm.org/Topic/4341/surcharged-conduits-and-phantom-storage talks about problems with tunnels and the surcharge algorithm. If i may make a suggestion, before you make changes to the SWMM5 code you should try to understand how it works fully, but to answer your last question. A storage nodes has a solution that is very different in many aspects than a node that is surcharged and a node that is not surcharged. If you would look at the SWMM5 dynamic wave code it will be more clear as to HOW it is different.

dickinsonre commented 6 years ago

Thinking about this more there might be a simple flag that can be added to make the solution for storage or surcharged node transparent to the user. A key engine parameter is called yCrown (the crown of the highest connected pipe to a node), The program shifts to the surcharge algorithm at 0.96 * yCrown. If you change the code so that a 2D node has a yCrown above the rim elevation of the node then the surcharge algothim will not be used for node but the normal node continuity equation with the default surface area.

Regarding the weir vs orifice, i would suggest a weir only for the following reason ​Note: Weir and Orifice Flow Equations for a Weir in SWMM 5 If you use a weir in SWMM 5 then two flow equations are used

  1. The weir uses the weir flow equation when the head at the weir is between the invert elevation of the weir and the crown of the weir and
  2. An orifice equation when the head is above the weir crown or the weir is submerged Image is shown below https://swmm5.org/2013/08/04/weir-and-orifice-flow-equations-for-a-weir-in-swmm-5/
lrntct commented 6 years ago

@dickinsonre Thank you ery much for your comments.

A storage nodes has a solution that is very different in many aspects than a node that is surcharged and a node that is not surcharged. If you would look at the SWMM5 dynamic wave code it will be more clear as to HOW it is different.

I read the relevant part in the swmm hydraulic manual. I think I understand HOW the codes that update H for surcharged node and storage nodes are different. What I still fail to understand is WHY it is different. In dynamic wave routing, a node will always have a minSurfaceArea and a volume. So it is a kind of simplified storage. AFAIU, a storage node can surcharge (i.e all connected links are full), but will always use the under-relaxation scheme for updating its water depth, never the surcharge scheme. Why all types nodes are not doing the same?

Thinking about this more there might be a simple flag that can be added to make the solution for storage or surcharged node transparent to the user. A key engine parameter is called yCrown (the crown of the highest connected pipe to a node), The program shifts to the surcharge algorithm at 0.96 * yCrown. If you change the code so that a 2D node has a yCrown above the rim elevation of the node then the surcharge algothim will not be used for node but the normal node continuity equation with the default surface area.

That is indeed a neat idea. The drawback is that those nodes will never be reported as surcharged, I guess.

The other option would be to create another class of node, but it will imply large changes in the engine.

Regarding the weir vs orifice, i would suggest a weir only for the following reason ​Note: Weir and Orifice Flow Equations for a Weir in SWMM 5 If you use a weir in SWMM 5 then two flow equations are used

  The weir uses the weir flow equation when the head at the weir is between the invert elevation of the weir and the crown of the weir and

 An orifice equation when the head is above the weir crown or the weir is submerged

Image is shown below https://swmm5.org/2013/08/04/weir-and-orifice-flow-equations-for-a-weir-in-swmm-5/

I was thinking of simply hard-coding the weir and orifice equations in the coupling function. But it could make sense to re-use the swmm weir/orifice equations.

dickinsonre commented 6 years ago

It is always better to use the existing code. You can automatically make a new orifice and/or weir in the engine to communicate flows. Key code from SWMM5 for the handling of the calculation of depth in junctions, storage nodes etc

void setNodeDepth(int i, double dt)
//
//  Input:   i  = node index
//           dt = time step (sec)
//  Output:  none
//  Purpose: sets depth at non-outfall node after current time step.
//
{
    int     canPond;                   // TRUE if node can pond overflows
    int     isPonded;                  // TRUE if node is currently ponded 
    double  dQ;                        // inflow minus outflow at node (cfs)
    double  dV;                        // change in node volume (ft3)
    double  dy;                        // change in node depth (ft)
    double  yMax;                      // max. depth at node (ft)
    double  yOld;                      // node depth at previous time step (ft)
    double  yLast;                     // previous node depth (ft)
    double  yNew;                      // new node depth (ft)
    double  yCrown;                    // depth to node crown (ft)
    double  surfArea;                  // node surface area (ft2)
    double  denom;                     // denominator term
    double  corr;                      // correction factor
    double  f=0.0;                     // relative surcharge depth

    // --- see if node can pond water above it
    canPond = (AllowPonding && Node[i].pondedArea > 0.0);
    isPonded = (canPond && Node[i].newDepth > Node[i].fullDepth);

    // --- initialize values
    yCrown = Node[i].crownElev - Node[i].invertElev;
    yOld = Node[i].oldDepth;
    yLast = Node[i].newDepth;
    Node[i].overflow = 0.0;
    surfArea = Xnode[i].newSurfArea;

    // --- determine average net flow volume into node over the time step
    dQ = Node[i].inflow - Node[i].outflow;
    dV = 0.5 * (Node[i].oldNetInflow + dQ) * dt;

    **# // --- if node not surcharged or the node is a storage node , base depth change on surface area**        
    if ( yLast <= yCrown || Node[i].type == STORAGE || isPonded )
    {
        dy = dV / surfArea;
        yNew = yOld + dy;

        // --- save non-ponded surface area for use in surcharge algorithm     //(5.1.002)
        if ( !isPonded ) Xnode[i].oldSurfArea = surfArea;                      //(5.1.002)

        // --- apply under-relaxation to new depth estimate
        if ( Steps > 0 )
        {
            yNew = (1.0 - Omega) * yLast + Omega * yNew;
        }

        // --- don't allow a ponded node to drop much below full depth
        if ( isPonded && yNew < Node[i].fullDepth )
            yNew = Node[i].fullDepth - FUDGE;
    }

    // --- if node surcharged, base depth change on dqdh
    //     NOTE: depth change is w.r.t depth from previous
    //     iteration; also, do not apply under-relaxation.
    else
    {
        // --- apply correction factor for upstream terminal nodes
        corr = 1.0;
        if ( Node[i].degree < 0 ) corr = 0.6;

        // --- allow surface area from last non-surcharged condition
        //     to influence dqdh if depth close to crown depth
        denom = Xnode[i].sumdqdh;
        if ( yLast < 1.25 * yCrown )
        {
            f = (yLast - yCrown) / yCrown;
            denom += (Xnode[i].oldSurfArea/dt -             
                     Xnode[i].sumdqdh) * exp(-15.0 * f);     
        }

        // --- compute new estimate of node depth
        if ( denom == 0.0 ) dy = 0.0;
        else dy = corr * dQ / denom;
        yNew = yLast + dy;
        if ( yNew < yCrown ) yNew = yCrown - FUDGE;

        // --- don't allow a newly ponded node to rise much above full depth
        if ( canPond && yNew > Node[i].fullDepth )
            yNew = Node[i].fullDepth + FUDGE;
    }

    // --- depth cannot be negative
    if ( yNew < 0 ) yNew = 0.0;

    // --- determine max. non-flooded depth
    yMax = Node[i].fullDepth;
    if ( canPond == FALSE ) yMax += Node[i].surDepth;

    // --- find flooded depth & volume
    if ( yNew > yMax )
    {
        yNew = getFloodedDepth(i, canPond, dV, yNew, yMax, dt);
    }
    else Node[i].newVolume = node_getVolume(i, yNew);

    // --- compute change in depth w.r.t. time
    Xnode[i].dYdT = fabs(yNew - yOld) / dt;
RudyFrom3 commented 6 years ago

based on #124 being closed off, I am assuming that the weir/orifice connection to SWMM is now operational and that the stumbling block for 2D models now is only on how to link the exchange of information to and from SWMM? So to drive the Weir/Orifice a value of depth is required that is representative of the depth over a pit Top. For Pits that Surcharge, the Flow from SWMM needs to be passed back to the 2D model. There is the third required component.... Once the depth is passed, the Weir/Orifice calculation identifies a Flow, which may or may not be excepted by the connecting pipe link. So a secondary calculation is required in SWMM to identify that the Pipe has the capacity to except the total flow (that coming from pipes upstream if any, and the Pit Top Flow). This calculation may inform that the PitTop flow is in fact limited to something less than that calculated by the PitTop. It is important to do this check as this is the flow that needs to be removed from the 2D model, and also to ensure Volumetric accounting is accurate. That is, no water is lost, because of differences in Pipe & Pit capacities! So to Summarise there are three pieces of information required and a further check:

lrntct commented 6 years ago

@RudyFrom3

Once the depth is passed, the Weir/Orifice calculation identifies a Flow, which may or may not be excepted by the connecting pipe link. So a secondary calculation is required in SWMM to identify that the Pipe has the capacity to except the total flow (that coming from pipes upstream if any, and the Pit Top Flow)

When using the dynamic solver, a SWMM node is a storage. All the flows that enter a node(from pipes, user inflow, catchment, etc.) are added to/subtracted from the amount of water stored in the node. This in turn changes the water surface elevation in the node. The latter is used to calculate the flow in the pipes connected to the node at the next time step. The mass balance is maintained at all time.

Now, the added interchange code can add or remove quite a bit of mass from one time-step to another, which in turn could induce oscillations. Some techniques are implemented in the code to limit the potential instabilities. See especially the coupling_findNodeInflow function. First the exchange flow cannot change sign from one time-step to another. Second, there is a flow limiter that prevents negative depth in the surface model.

In my PhD thesis there are more details on how this was implemented in Itzï, and the influence of those techniques on the coupled model stability. The sections of interest are 2.2 and 3.2.

RudyFrom3 commented 5 years ago

Hi all, just a desperate Plea for a Status Update ?? What needs to be completed for there to be a Generic available method to link SWMM to 2D models ? I am at a point where I am willing to pay some one if there needs to be coding done ? Where to from here ?

bemcdonnell commented 5 years ago

@RudyFrom3,

the feature "as-is" is already sitting in the feature-2dflood feature branch. The biggest thing that needs to happen at this point are unit/reg tests and documentation. I'm not sure of the status of it - but if you are to begin using it, you should log bugs and other issues that you have with it. When a contributor brings this 2D link implementation to the finish line, the we can merge it all the way up to the develop branch. But nothing should be stopping anyone from using it "as-is" today.

Does this make sense?

bemcdonnell commented 5 years ago

I'm particularly interesting in @dickinsonre's thoughts on this as well

RudyFrom3 commented 5 years ago

Ok... is there any where a small example of how it is to operate ?

Once I can determine how this is done I'd be very happy to set up various tests....

dickinsonre commented 5 years ago

I will comment on this, Rudy, later in the week. It might take me all werk @RudyFrom3 due to just getting back to my normal work schedule after a long month of traveling

michelleannesimon commented 5 years ago

thanks

bemcdonnell commented 5 years ago

@lrntct, do you have any documentation on how to use this feature?

lrntct commented 5 years ago

@bemcdonnell I guess the best documentation would be a code example. Maybe I should make a pyswmm PR for the code I have? I really want to implement that new functionality in Itzï, but I did not find the time to do it yet. When I eventually do so, I can write a more generic documentation at the same time.

lrntct commented 5 years ago

@RudyFrom3 I try to do a synthesis: First, in the nodes you want to couple you have to create openings with swmm_setNodeOpening(), and set the couplingArea with swmm_setNodeParam(). As well, you have to make sure that you allow ponding in nodes, otherwise the node will never overflow (that is still something that could be improved, but @dickinsonre had a good idea how to do it.).

Then, at every timestep: swmm_setNodeParam() to set the new overlandDepth (and couplingArea if changed). swmm_getNodeResult() to get couplingInflow to remove from the surface model.

That is pretty much it. At every SWMM timestep, SWMM will calculate couplingInflow using overlandDepth and the openings parameters. couplingInflow is counted by SWMM as part of lateral inflows.

RudyFrom3 commented 5 years ago

Ok... and if for example the pipe is already full... how to pass any surcharge back to 2D model ?

bemcdonnell commented 5 years ago

@lrntct, I think it would be awesome to add a few unit tests to ensure the behavior you are after is in fact working. It could also serve as an example in the C code to use the C API. Meanwhile, you could also do the same on the pyswmm Project.

lrntct commented 5 years ago

@RudyFrom3 In that case couplingInflow will be negative. Just change the sign and add that volume to your surface model. @bemcdonnell I guess test_toolkitapi_gage.cpp is a good example for that?

rudyvandrie commented 5 years ago

we are working on linking ANUGA {in a pre Xmass Hackathon}... (cant seem to find test_toolkitapi_gage.cpp , where is it located ??) I take it the only communication now required is: - Passing ANUGA surface Depth as overlandDepth in Swmm.... and couplingInflow (+ve or -ve) from SWMM back to ANUGA.... That will in essence allow complete connectivity ??? The new Opening object solves a lot of issues.... (So thanks for the efforts !!) {Will report on progress....}

dickinsonre commented 5 years ago

Hello Rudy, Do you mean this location for test_toolkitapi_gage.cpp https://github.com/OpenWaterAnalytics/Stormwater-Management-Model/tree/develop/tests

rudyvandrie commented 5 years ago

Ah thanks... another question is related to the need to Set the Opening Type ? I would have thought that setting Orifice, Weir or Submerged Weir, is superfluous as in fact it should be handled by the changing depth... An opening generally operates as a weir initially... water falls over the edges, as depth increases it may change to an orifice.... All openings generally follow this characteristic (I think)

rudyvandrie commented 5 years ago

Maybe Type Should be a Vertical Opening or a Horizontal Opening.... (that is Wall.... or Floor Opening )

rudyvandrie commented 5 years ago

Also... what is the Coupling Area ?.... is it the physical area in the Surface Flow model ? Why is this important to SWMM ? The Opening, has a description of Length and Area, for the Weir & orifice

rudyvandrie commented 5 years ago

hi lrntct I'm wondering why there are no tests for the new Coupling process already ? Surely this had been done, in developing the code and in preparing it for use in Itzi ? We have spent a day and a half so far in looking at the swmm code and discovering what appears as an error on the 2dFlood branch in testing the Set_Node_params.... (To the untrained this seems a very complex and convoluted process??) So has no one else to date made progress with coupling ??

lrntct commented 5 years ago

@rudyvandrie There is no formal test because if I remember well, at the time the test framework was broken.

The opening type is a place holder otype = type of opening (grate, etc). Not used yet

couplingArea is the area of the surface model that is connected to SWMM. It is used in the flow limiter (see coupling_findNodeInflow)

RudyFrom3 commented 5 years ago

Ah Ok... Does the Opening Object confirm that the Pipe Flow Capacity is not limiting the Coupling Flow ? (Where is the code that does that check ?) Recall that there are two mechanisms that limit flow from the surface, the Openingflow, and the Pipe Flow capacity... (It would be hugely appreciated if pointers assistance can be provided in how tests are created through BOOST etc...)

lrntct commented 5 years ago

@RudyFrom3 As discussed earlier, the coupling does not need to take into account the pipe capacity because SWMM does that already. If the pipes in the network do not have the capacity, then the water level in the node will increase.

RudyFrom3 commented 5 years ago

ahhh Awesome.... Thanks

stoiver commented 5 years ago

@lrntct, in preparation for coupling to a 2d domain, we have created a simple example using pyswmm https://github.com/stoiver/pyswmm/blob/surfaceCoupling/examples/pyswmm_example.py to understand the exchange parameters.

In our example we have set up a node connected to an outfall via a pipe.

Our plan is to produce a unit test for the coupling code for swmm, but this example has raised some questions before we continue.

The full output is available here https://github.com/stoiver/pyswmm/blob/surfaceCoupling/examples/pyswmm_example.txt driven with an inp file https://github.com/stoiver/pyswmm/blob/surfaceCoupling/examples/swmm_pipe_test.inp

At the end of our simulation we are getting the following output from the pyswmm_example.py script.

STEP  14
Current time 2017-03-09 00:00:15
Elapsed time 15.0
Advance seconds 1.0
Opening 0 flow 1.00011136155
==================================================
Inlet total_inflow 0.0
Inlet total_outflow 0.271015433354
Inlet coupling_inflow 5.72647899577
Inlet coupling_area 1.0
Inlet overland_depth 1.0
Inlet number of openings 1
Inlet depth 1.72177221164
Inlet volume 0.0
Inlet surcharge depth 0.15
Inlet flooding 0.0
Inlet lateral_inflow 0.0
==================================================
Outlet total_inflow 0.271015433354
Outlet total_outflow 0.0
Outlet coupling_inflow 0.0
Outlet coupling_area 0.0
Outlet overland_depth 0.0
Outlet number of openings 0
Outlet depth 0.355715906694
Outlet volume 0.0
Outlet surcharge depth 0.0
Outlet flooding 0.0
Outlet lateral_inflow 0.0
==================================================
Culvert link flow 0.271015433354
Culvert Area 3.06466208748
Culvert Froude 0.838251235072
Culvert Depth 0.369406178868
Culvert Flow limit 10.0
Culvert volume 4.2625312934
======================================================================
Current Time 2017-03-09 00:00:16
End time 2017-03-09 00:01:01

Note that Culvert link flow, Inlet total_outflow and Outlet total_inflow have reached a steady state of 0.271015433354. But the calculated Inlet coupling_inflow is 5.72647899577 which is more that an order of magnitude higher. It doesn't seem reasonable to use this value to extract water from the 2d domain. So what does this mean?

Also it would be great have some advice on which parameters we need to use and set when coupling to a 2d model.

Also what is the role of total_inflow and total_outflow (should we use them to ascertain the amount of water to extract and inject from the 2d model).

Does this example make sense? Any advice with setting up a simple coupling example, both via the inp file and the python script, would be very appreciated.

Cheers @stoiver @RudyFrom3 @88hoddle @uniomni

rudyvandrie commented 5 years ago

As I understand it in SWMM totalinflow at a Node is the combination of all flows, pipe flow combined with surface inflow ? In his comment lrntct commented on Oct 22, he describes the transfer of data from Surface Flow Model to SWMM So once the Opening is created he says:

Then, at every timestep: swmm_setNodeParam() to set the new overlandDepth (and couplingArea if changed). swmm_getNodeResult() to get couplingInflow to remove from the surface model.

That is pretty much it. At every SWMM timestep, SWMM will calculate couplingInflow using overlandDepth and the openings parameters. couplingInflow is counted by SWMM as part of lateral inflows.

dickinsonre commented 5 years ago

Rudy - the total inflow to a node is the combination of the link flows to the node (including reverse flow) plus any lateral inflow to the node (runoff, dwf, rdii flow, external inflow).

rudyvandrie commented 5 years ago

Yes when it comes to coupling... to a 2D surface model, I think @lrntct is right in saying the only transfer of information required is: The representative depth driving flow into the opening object on the node, and the computed flow accepted by swmm, that ofcourse may require adjustment based on the availability of volume for the time step.

So at some point there needs to be volumetric accounting in both SWMM and the 2D surface Model to Ensure Volume is not lost or arbitrarily added to SWMM for which it is not physically available from the 2D model I guess ???

dickinsonre commented 5 years ago

Hello @rudyvandrie if you connect the 1D node to the 2D mesh elements using a SWMM5 outfall then you will be able to use the already existing excellent 1D mass balance accounting. Flow out of the 1D to the 2D will be summed in the outfall summary tables and the overall mass balance.

RudyFrom3 commented 5 years ago

Thanks @dickinsonre, it seems we are struggling to determine the mechanics required as eluded to by @stoiver on 19/12/2018. Ideally as suggested if there was an example available to aid in identifying the mechanics of passing the data etc. It would be immensely helpful. It is understood that the surface depth is passed swmm_setNodeParam(overlandDepth), and the swmm_getNodeResult(couplingInflow) is returned from SWMM, this should then be verified by the 2D model as being physically available for removal I guess, and if not available swmm_getNodeResult(couplingInflow) updated to reflect what quantity is available ?? The mass Balance needs to be accounted by both platforms.... Is there anywhere an example available ?

lrntct commented 5 years ago

@stoiver Sorry for the late answer. The holidays arrived and I forgot :)

Some comments: